loader from loading.io

Episode #1 An Overview

Our Country Cottage a Narrative

Release Date: 09/10/2016

Episode #29 An OCC Update show art Episode #29 An OCC Update

Our Country Cottage a Narrative

In this episode I will get you more up to date with the goings on at OCC and there are changes at the web site. On with the OCC update. When last we talked I had basically shut OCC down by draining the water, putting RV antifreeze in sink and tub traps. The toilets were drained of water but then filled with RV antifreeze and then flushed. This ensured no water was left in the mechanism and the bowel had only antifreeze in it. The toilet shut offs were the only taps I closed. If I left them open the antifreeze in the tank would siphon out. Any liquids that might freeze if the...

info_outline
Episode #28 An OCC Update + Year In Review show art Episode #28 An OCC Update + Year In Review

Our Country Cottage a Narrative

In this episode I will get you more up to date with the goings on at OCC and an OCC Year In Review, remembering some of what happened last year. So on with Episode 28 OCC update. As usual I left the last episode with some unanswered questions. Once again our trusty generator was not so trusty, refusing to start. Three days before my next visit we had a major snow dump in the city. I think I shoveled the walk 3 maybe 4 times that day. It just kept coming. The next day, taking my life into my own hands, and on summer tires, I ventured out onto snow clogged streets in an attempt to get...

info_outline
Episode #27 An OCC Update & ITB Wrap Up show art Episode #27 An OCC Update & ITB Wrap Up

Our Country Cottage a Narrative

In this episode I will bring you up to date with the goings on at OCC and, as promised, the ITB wrap up. Finally I can close the book on ITB, In The Beginning. No more confusion with episode numbers and ITB progress month numbers. Hey, it was getting confusing for me. *******On With In The Beginning Wrap Up****** It was at the end of month 27, (no, lets not go there again) two years and three months, that there was a logical point to finish with contractors, etc. and take sole claim of Our Country Cottage. Not everything was finished but enough was enough and we decided to cut the cord. As...

info_outline
Episode #26 An OCC Update & ITB Month 27 show art Episode #26 An OCC Update & ITB Month 27

Our Country Cottage a Narrative

In this episode I will get you caught up to date with the goings on at OCC and ITB, In The Beginning, well, this might be the last one. Lets start with probably the most action packed ITB yet. ***In The Beginning, Month 27, October *** ITB is the part the podcast where I use pics, my log book, texts and emails along with any other mind jogs I can find to give you the most accurate recollection of the creation of OCC. I even referred to an old check book record this time. Looks like we had five, three day trips, to Our Country Cottage this month. In the last ITB I had noticed a boom loader,...

info_outline
Episode #25 Summer is Back & ITB Month 26 show art Episode #25 Summer is Back & ITB Month 26

Our Country Cottage a Narrative

In this episode Our Country Cottage finally breaks free of winters grip, entering the summer months while In The Beginning, ITB, reveals some progress. ***In The Beginning, Month 26, September.*** ITB is the section of the podcast where I do my best to remember, through pictures, my log book, texts and invoices, well basically anything I can get my hands on.During this period of little getting done, it seems I also did little with my log book. That is to say sketchy notes. The second month of year three of the creation of Our Country Cottage started with our contractor calling to say he...

info_outline
Episode #24 Day Trips & ITB, 1st Month of Year THREE show art Episode #24 Day Trips & ITB, 1st Month of Year THREE

Our Country Cottage a Narrative

In this episode Our Country Cottage has not finished sending me power failure alerts and In The Beginning, ITB, covers the first month of year three of construction. In The Beginning, month 25, August. This is the part of the episode where I go through pix, emails, logs etc to give you the best recollection of the construction of Our Country Cottage. I had three visits to OCC this month. Each was three days long. The first visit, I had a load of those flat pack boxes from that store, known for its assemble yourself furniture. My collection promised that they would turn into two closet...

info_outline
Episode #23 A New Year and ITB Finishes Year TWO show art Episode #23 A New Year and ITB Finishes Year TWO

Our Country Cottage a Narrative

This episodes OCC update will get into why power was lost on the last day of last year and what has been going on with me and my relationship with Our Country Cottage. In The Beginning, ITB month 24, will close out the second year of OCC construction. I am beginning to think that doing ITB is not helping my attitude towards OCC. I don’t know if it is cathartic, with a positive effect, as I thought it would be or it’s just dredging up all those memories and reopening the wounds, so to speak. For now we’ll go with the first one,  Sooo In The Beginning, month 24, July. This is the...

info_outline
Episode #22 Power Failure & ITB Month 23, an Inspection and More Mud show art Episode #22 Power Failure & ITB Month 23, an Inspection and More Mud

Our Country Cottage a Narrative

In this episode Our Country Cottage reaches out to say it has lost power, the solar control unit stops logging and snow. In The Beginning, ITB, Month 23, June, standing water and a walk through inspection. In The Beginning, month 23. ITB is the part of the podcast where I collect all my emails, texts, logs, notes, pix etc to try to give the best recollection of the early days of OCC, Our Country Cottage. It seems to be getting harder and harder to figure out as the changes are getting smaller and smaller and sometimes none at all. I have vivid memories of arriving at the site and finding...

info_outline
Episode #21 An Over Due Project and ITB Month 22, Mud&Stuff. show art Episode #21 An Over Due Project and ITB Month 22, Mud&Stuff.

Our Country Cottage a Narrative

  In this episode I will tell you about getting to a project that was some five years past due and In The Beginning, Month 22, almost 2 years in, and still going at it. And an OCC update, well, brings you up to date. ITB, month 22, May. In The Beginning, is the part of the podcast where I recount the birthing pains of Our Country Cottage. Pictures, emails, texts and my log book have given me a memory refresh to present the most accurate information of the time. 22 months in and the big things are pretty well done and now we get down to the details. One important detail that happened...

info_outline
Episode #20 An OCC Update, Longer Stays & ITB Month 21 show art Episode #20 An OCC Update, Longer Stays & ITB Month 21

Our Country Cottage a Narrative

This episode,  An OCC update, I will cover the first extended stay of the season, almost back to normal, and ITB carries on with month 21 of construction. Not much happened while the power was down, in some areas. In The Beginning, ITB, Month 21, April This is the part of the episode where I sift through emails, text messages and pictures collected during that month, to give you the most accurate accounting of Our Country Cottages beginning stages. The beginning of month #21 still had OCC without power backup working. The generator was fixed but something in the solar control system,...

info_outline
 
More Episodes
    An overview of our country cottage. We are on a quarter section which is a half mile by a half mile square. Ruffly 160 acres. Property was bought 15 to 20 years ago and construction started 4 years ago and completed 2 years ago. The cottage is about 1500 square feet. Three bedrooms, one large master upstairs and two small bedrooms downstairs .The downstairs bedrooms can convert into one larger room with a garage door that rolls up into a false ceiling. Two full bathrooms. The one upstairs is an ensuite with an enclosed shower and a soaker tub which is elevated so you can see out the window. Downstairs has a large enclosed shower. The entrances to the cottage are through, a mud room or a sunroom, each act as an airlock to keep heat in. Kitchen is equipped with fridge, induction cook top, and dishwasher. All appliances were chosen for their efficiency of power. There is also a pantry. The living room has a masonry heater. A utility room and a battery room. The battery room has its own entrance and is under the sun-room. A detached 24' by 24' garage has a loft on top. Water comes from a well,  240 feet deep. The septic system includes a septic tank and a septic mound. Power is supplied by 30 photovoltaic solar panels with a battery bank and is backed up by a propane generator fed by a 1000 gallon propane tank. Heat is provided a number of ways... passive solar masonry heater (wood fired) in floor radiant (electric boiler) 2 solar collectors, on the roof, heat either a small radiator in the back hall or, preheat the domestic hot water The domestic hot water is heated by the same electric boiler that is used by the in floor radiant heating. The cottage is well insulated with spray foam and the windows are all triple glazed. Future episodes will go deeper into all the different systems that make up our country cottage. The next episode will concentrate on what powers us out in the sticks.